MC Machinery Systems Breaks Ground for Headquarters
The new corporate headquarters are slated to be completed December 2016.
Share




MC Machinery Systems and its partners, The Opus Group (Minnetonka, Minnesota), Elk Grove Village and Heitman Architects (Itasca, Illinois), held an official groundbreaking ceremony June 30, 2016, at the construction site for a new corporate headquarters in Elk Grove Village, Illinois. Attendees witnessed the current land clearing and preparation of the 11.7-acre lot on which the facility will be constructed, and participated in a virtual reality experience simulating the lobby of the future headquarters.
Construction of the new, 175,000-square-foot corporate headquarters is slated to be completed December 2016. According to the company, proximity to Chicago’s interstate 90 and O’Hare International Airport were important factors when choosing the location for the new facility. Another concern was to retain its long-tenured employees by choosing a location close to the existing facility.
The new facility will include a variety of spaces tailored to accommodate customer product demonstrations, research and development, machine refurbishment, and customer support. In total, the building will feature 50,000 square feet of office space spread across two stories; 75,000 square feet of ancillary office and storage areas; and a 50,000-square-foot showroom.
Related Content
-
The Benefits of In-House Toolmaking
The addition of two larger gantry routers has enabled a maker of rubber belting products to produce more tooling in-house, reducing lead times and costs for itself and its sister facilities.
-
FANUC Details Robotic Vision, ROBODRILLS and More at IMTS 2024
FANUC’s IMTS 2024 booth includes real-time demonstrations that show the abilities of its equipment, including robots, controllers and machine tools.
-
Shop Tour Video: Inside a Family-Owned Machine Shop Specializing in High-Precision Plastics
In this episode of “View From My Shop,” East Coast Precision Manufacturing guides us through their plastics job shop. Learn how this shop has quickly and inexpensively built out its shop floor, as well as how it formed a niche for itself during difficult business conditions.